Picture Shutterstock.
Four developments individually costing more than $1 million were given the go ahead at MidCoast Council's October ordinary meeting
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Two of the developments are in the Manning Valley and two in the Great Lakes region, as follows:
Blackhead Road, Black Head
- Multi-dwelling housing consisting of 10 two-level terrace dwellings.
- Estimated cost $5.4 million.
- DA lodged September 30, 2022.
- Applicant Harriman Pty Ltd trading as Esse Projects.
11-13 Bottlebrush Drive, Tallwoods Village
- Subdivision of three Torrens title lots and construction of three multiple-level separate units.
- Estimated cost $1,693,600.
- DA lodged March 16, 3023.
- Applicant Storm and Bronwyn Botton.
5 Pacific Parade Elizabeth Beach
- Subdivision of two lots with demolition of existing structure/s for construction of a two-level dual occupancy dwelling, both units with pools.
- Estimated cost $2,127,400.
- DA lodged October 31, 2022.
- Applicant Arkhaus / F Banales, Roseberry.
47-49 Marine Drive, Tea Gardens
- Subdivision of four lots and construction of four two-level units.
- Estimated cost $2,798,000.
- DA lodged January 12, 2023.
- Applicant Combined Development Group Pty Ltd, Tea Gardens.